Sign In
2021 2nd Alert HiPo#01 mast fall onto the headrest
The Hoist was being prepared for the rig move. The mast was scoped in, travelling block and monkey board were secured. After having everyone positioned in accordance with the responsibilities allocated during the pre-task safety meeting, Driller started lowering the mast onto the headrest. While doing so, the top small hydraulic cylinder did not retract and the large bottom cylinder came out of the mast raising mechanism housing causing the mast to free fall onto the headrest
Always follow safe work practices and comply with written instructions Always intervene and stop the work if conditions are unsafe Always perform risk assessment and conduct pre-job safety meeting with all parties involved in the task Always monitor pressure gauges and ensure they have valid calibration Always maintain safe distance while raising/lowering the mast Always stay away from red zones and be aware of line of fire hazards

Category:Second AlertsDocument Type:Safety
Format:pptx<br/>Viewers:108
Download: