2022 2nd Alert Hipo#34 SOS CT Ejected out of injector head
During rig down of CTU Injector and top section operations of unit CT-39 in order to allow Slickline to rig up, a miss communication from banksman to the CTU operator to stop pulling the coil out from the lubricator leading to fully ejecting of the coil from the injector and fall to the ground.
Always review the design of service with DESC Engineer and Base Manager. Always have NoGo at the end of the CT Pipe at all times. Always trigger MOC if a deviation from the procedures is a must. Always avoid doing multi tasking and focus on the in-hand task. Conduct STOP and intervention drills regularly. Always install a NoGo at the end of CT Pipe for Rig Up/ Rig down and during Coiled Tubing Operation.
The equipment set up didn’t consider the potential skid out and potential Slick Line Operation The procedure of Rig up/ Rig down of injector head not followed by taking out the NoGo. The crash frame was not requested for proper rig down of the injector head. Supervisor was multitasking to accelerate the rig down. STOP authority and intervention was not performed by crane operator.

Category:Second AlertsDocument Type:Safety
Format:pptx<br/>Viewers:7
Download: