Sign In
2018 Second Alert - SA008_HiPo08
While laying down 4½” liner running tool (16 Meters length) using crane from V door side and elevator from the rig floor, the R/T got broken at 1.5m height, from the rotary table. One side of the broken tool (weight 300Kg), swung towards the draw works and remained suspended on the Elevator. The other broken part (Weight 55Kg), that came in contact with the rig floor, remained suspended on the crane.
Always ensure 3rd party supervision is on the drill/work floor while running or laying down any 3rd party tools Ensure effective two way communication at all times Ensure you are authorised to carry out the task Drillers should not perform any task involving third-party tools without clear instructions / confirmation of the Tool Pusher & DSV Ensure adequate work instructions / TRIC card / Lift plan, to control the work between all parties involved

Category:Second AlertsDocument Type:Safety
Format:.pptxViewers:8
Download: