2018 Second Alert - SA021_HiPo21
While the crane operator taking back the slings after offloading the pipe at pipe rack, the slings of the crane contacted with OHL resulted in spark and OHL cut.
PH should always seek for assistance of PA/Supervisor when you are in doubt. Always ensure OHL Clearance certificate available / required while working under OHL using lifting equipment. Ensure Goal post is made while lifting activity carried out near to OHL PA should ensure Dynamic TRIC been used effectively by PH with proper control measures in place. Adequate supervision Always intervene on unsafe acts or conditions.

Category:Safety AlertsDocument Type:Safety