2018 Second Alert - SA014_LTI14
While mast lowering preparation, a roustabout was assigned to guide the winch and install locking pin. Assistant driller was acting as banksman in order to set the winch on its base, while doing so the utility winch imbalanced and swung, which resulted in Roustabout left arm being caught between the winch and dolly beam.
Highlight any design issues or difficulties to your supervisor and management Always use two leg wire rope sling with D-link to lift the utility winches. Ensure valid PTW,TRIC and lift plan is obtained for critical tasks Stopped the job if it is not safe to do so.