Sign In
2020 2nd alert HiPo#30 (Drops) liner hanger running tool
During laying down of liner running tool (total length of Running tool was 12m) onto the cat walk using rig winch from top side and crane with sling from the lower part. A bend on the string was noticed, the string parted from the connection below the running tool. The running tool was at a height around 7m above the cat walk and the lower part length was about 6m. Each part hung and swung above the cat walk area. Catwalk area was clear of personnel. The two parts were laid down separately.
Always perform risk assessment prior to commencing a task Always prepare lift plan to address every lift. Always involved all concerned parties into the pre-task safety discussion. Always address all safety precautionary measures requested by PTW procedure. Always STOP unsafe acts/conditions. Always ensure tandem lift is given additional considerations. Always fully address 10 questions for a safe lift prior to lifting.

Category:Second AlertsDocument Type:Safety
Format:.pptxViewers:16
Download: