You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
IFADAH
Golden Rules
Life Saving Rules
Page Content
2025 Second Alert HiPo#05 Drop grating during lifting
During a day shift operation, a third-party slickline (SLK) crew was lifting the lubricator into the wellhead through the coil tubing (CT) tower (yellow area). While doing so, a D-shackle—part of the lifting accessories—contacted a removable grating (red highlighted) from the top section of the CT tower, causing it to fall. At the time of the incident, a banksman was standing on the scaffolding below the tower, near the line of fire. Fortunately, no injuries were reported
• Lifting supervisor should always ensure supervision in the crucial lifting activity. • Ensure always the interface with a third party to be fully access and adequate control to be in place. • Ensure always continuous improvement and revalidation of SOP & JSA and equipment requirement considering new practices
• Improper behavior & Inadequate Lifting supervision • Lack of control and verification before approving a PTW. • XOM SLK JSA didn’t specify the requirements for running the lubricator through CT Tower • The XOM SLK Lifting Plan was generic and wasn’t job-specific. • No lifting supervisor nor dedicated Banksman in place. • The job was considered routine. • No 3rd party checklist verification was conducted.